Building health · MANHATTAN, NY

19 Stanton St

built 1900 · 4 stories · 13 apartments
Also known as 205 Chrystie St — one building, several doors.

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
Boiler burning No. 2 oil (H.B.Smith G300-S12), registration current since Oct 2026
Clean Air Tracking System (boiler registrations)
2026 Jul
Latest accepted inspection Jul 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
LeaksApt 20
Housing Maintenance Code Complaints and Problems
2024 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2024 Oct
Fire safety class C · closed
2024 Oct
MoldApt 41
Housing Maintenance Code Complaints and Problems
2019 Nov
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2018 Aug
Plumbing permit, General construction permit
2018 Apr
Plumbing permit, General construction permit
2017 Aug
Smoke or CO detectors class A
Housing Maintenance Code Violations
2016 Dec
No active shed permit
DOB NOW: Build – Approved Permits
2016 Apr
Plumbing permit, General construction permit
2016 Mar
General construction permit
2016 Mar
General construction permit
2010 Aug
Walls, floors and stairsApt 43 class C · never closed
Housing Maintenance Code Violations
2007 Oct
Latest boiler work permit 2007 (2 on record)
DOB Permit Issuance (BIS)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1900
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.