Building health · MANHATTAN, NY

183 Pinehurst Ave

built 1930 · 5 stories · 36 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jul
1 active elevator; latest periodic inspection Jul 2026
DOB NOW Elevator Safety Compliance
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2026 May
Construction
DOB Violations
2025 Nov
Heat or hot waterApt 12
Housing Maintenance Code Complaints and Problems
2025 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2023 Nov
Boiler burning No. 4 oil (Rockmills MP-60), registration expired since Nov 2023
Clean Air Tracking System (boiler registrations)
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2015 Apr
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2013 Aug
Plumbing permit, General construction permit
2007 Sep
Plumbing permit, General construction permit
2005 Dec
Plumbing permit, General construction permit
1930
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.