Building health · MANHATTAN, NY

1796 3 Ave

built 1910 · 4 stories · 14 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Feb
Other conditions class A
Housing Maintenance Code Violations
2026 Feb
Fire safetyApt 1A class C
2026 Feb
Heat or hot waterApt 1A class C
2026 Feb
Heat or hot water class C
2026 Feb
Heat or hot waterApt 4A class C
2026 Feb
Latest accepted inspection Feb 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Feb
Heat or hot waterApt 2D
Housing Maintenance Code Complaints and Problems
2025 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2025 Oct
General construction permit
DOB NOW: Build – Approved Permits
2025 Aug
Boiler burning natural gas (Weil Mclain EGH-105), registration current since Aug 2025
Clean Air Tracking System (boiler registrations)
2025 Mar
SafetyApt 3B
Housing Maintenance Code Complaints and Problems
2025 Feb
Heat or hot waterApt 2B
2025 Jan
Heat or hot waterApt 2B
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2001 Mar
Latest boiler work permit 2001
DOB Permit Issuance (BIS)
2001 Mar
Plumbing permit, Boiler permit
DOB NOW: Build – Approved Permits
2000 Sep
Plumbing permit, Heating/ventilation permit, General construction permit
1998 Sep
General construction permit
1910
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.