2027 Sep
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Oct
General construction permit
2026 Sep
Supported scaffold permit
2025 Oct
VT-PER-CO Elevators
DOB Violations
2025 Jul
Latest accepted inspection Jul 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Jun
Supported scaffold permit
DOB NOW: Build – Approved Permits
2025 Apr
1 active elevator; latest periodic inspection Apr 2025
DOB NOW Elevator Safety Compliance
2024 Aug
Heating/ventilation permit, General construction permit, Plumbing permit
DOB NOW: Build – Approved Permits
2023 Sep
Boiler burning natural gas (H.B. Smith 19-6), registration current since Sep 2023
Clean Air Tracking System (boiler registrations)
2023 May
Structural permit
DOB NOW: Build – Approved Permits
2022 Feb
0 open. 2 violations on record in all, 2022 — the 0 most recent are listed here
Housing Maintenance Code Violations
2017 Feb
Heating/ventilation permit, Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1997 Jan
Latest boiler work permit 1997
DOB Permit Issuance (BIS)
1992 Apr
Local Law 10/81 - Elevator never closed
DOB Violations
1883
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.