Building health · MANHATTAN, NY

1570 2 Ave

built 1900 · 4 stories · 12 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jul
Latest accepted inspection Jul 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Aug
Boiler burning natural gas (Weil Mclain EGH-115), registration current since Aug 2024
Clean Air Tracking System (boiler registrations)
2024 Apr
PestsApt 2D
Housing Maintenance Code Complaints and Problems
2017 May
Heat or hot water class C · paperwork
Housing Maintenance Code Violations
2016 May
General construction permit
DOB NOW: Build – Approved Permits
2011 Nov
Fire protection permit
2011 Aug
Plumbing permit, General construction permit
2011 Aug
Plumbing permit, Heating/ventilation permit, General construction permit, Construction fence permit
2011 Jan
General construction permit
2009 Aug
Construction fence permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1994 Oct
Latest boiler work permit 1994
DOB Permit Issuance (BIS)
1900
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.