Building health · MANHATTAN, NY
built 1910 · 4 stories · 6 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Oct
PL-PER Gas Piping - LL152
DOB Violations
2025 Aug
Mechanical systems permit
DOB NOW: Build – Approved Permits
2025 Jul
Boiler burning natural gas (Weil Mclain EGH-85), registration current since Jul 2025
Clean Air Tracking System (boiler registrations)
2023 Jun
Low Pressure Boiler
DOB Violations
2023 Apr
Low Pressure Boiler
2022 Feb
0 open. 10 violations on record in all, 2021–2022 — the 0 most recent are listed here
Housing Maintenance Code Violations
2021 Aug
No active shed permit; permits since Aug 2020, last expired Aug 2021
DOB NOW: Build – Approved Permits
2019 Oct
General construction permit, Plumbing permit
2018 Jul
Heating/ventilation permit
2017 Jun
Fire protection permit
2017 Feb
Plumbing permit, Heating/ventilation permit, General construction permit
2016 Jan
Plumbing permit
2015 Feb
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1910
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.