Building health · BROOKLYN, NY

1539 Sterling Pl

built 1917 · 4 stories · 28 apartments
Registered with the city: CITY STAR MANAGEMENT LLC · 1 other building here list it; SJ JOHNS ASSOCIATES LP; ST JOHNS 1 ASSOC

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
Heat or hot waterApt 2G
Housing Maintenance Code Complaints and Problems
2026 Oct
Paint or plaster, leaksApt 4B
2026 Oct
PlumbingApt 4B class B
Housing Maintenance Code Violations
2026 Oct
LeaksApt 4B class B
2026 Oct
Walls, floors and stairsApt 4B class B
2026 Oct
PlumbingApt 4B
Housing Maintenance Code Complaints and Problems
2026 Oct
Paint or plaster, leaksApt 4B
2026 Oct
PlumbingApt 4B class B
Housing Maintenance Code Violations
2026 Oct
Walls, floors and stairsApt 4B class C
2026 Oct
LeaksApt 4B class B
2026 Sep
Plumbing, leaksApt 4B
Housing Maintenance Code Complaints and Problems
2026 Sep
Fire safety class B
Housing Maintenance Code Violations
2026 Sep
Doors and windowsApt 4C class A
2026 Sep
Doors and windowsApt 4C class B
2026 Sep
Other conditionsApt 4C class B
2026 Sep
LeaksApt 2D class B
2026 Sep
Walls, floors and stairsApt 2D class A
2026 Sep
Walls, floors and stairsApt 2D class A
2026 Sep
Walls, floors and stairsApt 2D class B
2026 Sep
Walls, floors and stairsApt 2D class B
2026 Sep
PestsApt 2D class C
2026 Sep
PestsApt 2D class C
2026 Sep
Walls, floors and stairsApt 2D class B
2026 Sep
Walls, floors and stairsApt 2D class B
2026 Sep
Walls, floors and stairs class A
2026 Sep
Fire safety class B
2026 Sep
Leaks class B
2026 Sep
Doors and windowsApt 4B class A
2026 Sep
Doors and windowsApt 4B class A
2026 Sep
PlumbingApt 4B class B
2026 Aug
Boiler burning natural gas (Federal FST-50), registration current since Aug 2026
Clean Air Tracking System (boiler registrations)
2026 Aug
Electrical, floors or stairs, general repairs, paint or plaster, pests, leaksApt 2D
Housing Maintenance Code Complaints and Problems
2026 Aug
General repairs, plumbingApt 4C
2026 Aug
LeaksApt 4C
2026 Jul
LeaksApt 4B
2026 May
LeaksApt 4B class B · closed
Housing Maintenance Code Violations
2026 May
Doors and windows class C · closed
2026 May
Walls, floors and stairsApt 4B class B · closed
2026 May
Walls, floors and stairsApt 4B class B · closed
2026 May
Walls, floors and stairsApt 4B class B · closed
2026 May
Walls, floors and stairsApt 4B class B · closed
2026 May
Walls, floors and stairsApt 4B class B · closed
2026 May
Other conditionsApt 4B class B · closed
2026 May
LeaksApt 4B class B · closed
2026 May
Doors or windows, general repairs
Housing Maintenance Code Complaints and Problems
2026 May
Paint or plaster, plumbingApt 4B
2026 May
LeaksApt 4B
2026 May
Plumbing, leaksApt 4B
2026 May
Plumbing, leaksApt 4B
2026 Apr
Other conditionsApt 4G class B · closed
Housing Maintenance Code Violations
2026 Apr
Doors and windowsApt 4G class B · closed
2026 Apr
Heat or hot waterApt 4G class C · closed
2026 Apr
Fire safetyApt 4G class C · closed
2026 Apr
Construction class - 2
DOB Violations
2026 Apr
Heat or hot waterApt 3B
Housing Maintenance Code Complaints and Problems
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
Doors and windows class B · closed
Housing Maintenance Code Violations
2026 Mar
Doors and windows class C · closed
2026 Mar
Heat or hot water class C · closed
2026 Mar
Heat or hot waterApt 4G class C · closed
2026 Mar
Heat or hot waterApt 4G class C · closed
2026 Mar
General repairs, unsanitary conditionsApt 4G
Housing Maintenance Code Complaints and Problems
2026 Mar
Heat or hot waterApt 4G
2026 Mar
AppliancesApt 4G
2026 Mar
PlumbingApt 4C
2026 Mar
Unsanitary conditionsApt 4C
2026 Feb
MoldApt 4C
2026 Feb
Walls, floors and stairs class A · closed
Housing Maintenance Code Violations
2026 Feb
Leaks class C · closed
2026 Feb
Fire safety class B · closed
2026 Feb
Paint or plaster, leaksApt 4C
Housing Maintenance Code Complaints and Problems
2026 Feb
Walls, floors and stairs class A · closed
Housing Maintenance Code Violations
2026 Feb
Fire safety class B · closed
2026 Feb
Leaks class C · closed
2026 Feb
PlumbingApt 4C
Housing Maintenance Code Complaints and Problems
2026 Feb
ElectricalApt 2G
2026 Feb
Heat or hot waterApt 1E
2026 Feb
LeaksApt 4C
2026 Feb
Heat or hot waterApt 1G
2026 Jan
Walls, floors and stairsApt 4G class A · closed
Housing Maintenance Code Violations
2025 Dec
ElectricalApt 3A
Housing Maintenance Code Complaints and Problems
2025 Dec
General repairsApt 4G
2025 Dec
Doors or windowsApt 4G
2025 Dec
Doors or windows, heat or hot water, plumbing, moldApt 4G
2025 Dec
Doors or windows, heat or hot water, plumbing, leaksApt 4G
2025 Dec
Doors or windows, general repairsApt 4G
2025 Dec
Doors or windows, heat or hot water, plumbingApt 4G
2025 Oct
Outside the buildingApt 4C
2025 Oct
General repairsApt 4G
2025 Oct
Doors or windows, plumbingApt 4G
2025 Oct
Heat or hot waterApt 4G
2025 Sep
Doors or windows, general repairs, paint or plaster, plumbing, mold, leaksApt 4G
2025 Sep
LeaksApt 4B
2025 Sep
General repairs, plumbing, mold, leaksApt 4G
2025 Sep
MoldApt 4C
2025 Sep
LeaksApt 4B
2025 Sep
Paint or plaster, leaksApt 4B
2025 Sep
LeaksApt 4G
2025 Sep
LeaksApt 4B
2025 Sep
LeaksApt 4C
2025 Sep
LeaksApt 4G
2025 Sep
Appliances, floors or stairs, general repairs, plumbingApt 3D
2025 Aug
Floors or stairs, paint or plaster, plumbing, mold, leaksApt 4C
2025 Aug
Paint or plasterApt 4C
2025 Aug
General repairsApt 4C
2025 Aug
LeaksApt 4C
2025 Aug
LeaksApt 4G
2025 Aug
AppliancesApt 1D
2025 Jul
Unsanitary conditionsApt 4C
2025 May
PlumbingApt 4F
2025 Apr
Construction class - 1
DOB Violations
2025 Mar
Doors or windows
Housing Maintenance Code Complaints and Problems
2025 Mar
Heat or hot water
2025 Feb
Doors or windows, leaksApt 4C
2025 Feb
Doors or windowsApt 3G
2025 Feb
Doors or windows
2024 Nov
Heat or hot waterApt 4G
2024 Nov
PlumbingApt 4B
2024 Nov
Heat or hot waterApt 2G
2024 Sep
Paint or plasterApt 1E
2024 Aug
PestsApt 4G
2024 Aug
Unsanitary conditionsApt 4C
2024 Aug
General repairsApt 4C
2024 Jul
PestsApt 2D
2024 Jul
Pests, leaksApt 2D
2024 Jul
General repairs, unsanitary conditionsApt 4C
2024 Jul
Doors or windows, paint or plaster, pests, leaksApt 3A
2024 Jun
General repairsApt 4C
2024 Jun
Doors or windowsApt 4C
2024 Apr
Electrical, outside the building, leaksApt 4C
2024 Apr
Doors or windows, general repairsApt 4C
2023 Nov
Heat or hot water, plumbing, mold, leaksApt 4G
2019 Jun
Plumbing permit, Fuel burning permit, Boiler permit
DOB NOW: Build – Approved Permits
2017 Nov
Latest boiler work permit 2017 (2 on record)
DOB Permit Issuance (BIS)
2015 May
Boiler permit
DOB NOW: Build – Approved Permits
2014 Nov
Plumbing permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1917
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.
For AI and developers: llms.txt · API · MCP server · this card as markdown