Building health · MANHATTAN, NY
built 1929 · 31 stories · 529 apartments on its tax lot
Also known as 152 W 31 St, 371 7 Ave — one building, several doors.
Registered with the city: CYH Manhattan LLC; BG STEWART HOUSING DEVELOPMENT FUND CORP ORATION
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Dec
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Oct
VT-CAT1-CO Elevators
DOB Violations
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-CAT1-CO Elevators
2026 Oct
VT-PER-CO Elevators
2026 Oct
VT-PER-CO Elevators
2026 Oct
VT-PER-CO Elevators
2026 Oct
VT-PER-CO Elevators
2026 Sep
EN-BENCH Benchmarking - LL84
2026 Aug
Unsafe (cycle 10, filed Aug 2026)
DOB NOW: Safety – Facades Compliance Filings
2026 Apr
Pests class A · paperwork
Housing Maintenance Code Violations
2026 Mar
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2026 Feb
Construction class - 2
DOB Violations
2025 Nov
Other conditions class I · paperwork
Housing Maintenance Code Violations
2025 Nov
Low Pressure Boiler
DOB Violations
2025 Nov
Low Pressure Boiler
2025 Nov
Low Pressure Boiler
2025 Oct
VT-CAT1-CO Elevators
2025 Sep
PL-PER Gas Piping - LL152
2025 Jul
Structural permit, General construction permit
DOB NOW: Build – Approved Permits
2025 Jun
Structural permit
2025 Jun
11 active elevators; latest periodic inspection Jun 2025
DOB NOW Elevator Safety Compliance
2025 Jun
Pests class A · paperwork
Housing Maintenance Code Violations
2025 Mar
Unsanitary conditions
Housing Maintenance Code Complaints and Problems
2024 Dec
Heat or hot water
2024 Nov
PestsApt 328
2024 Oct
SafetyApt 618
2024 Aug
MoldApt 1229
2024 Mar
PestsApt 1704
2024 Mar
Heat or hot water, unsanitary conditions
2023 Sep
Latest accepted inspection Sep 2023, defects reported: no
DOB NOW: Safety Boiler
2023 Jun
Structural permit
DOB NOW: Build – Approved Permits
2022 Apr
Boiler burning No. 2 oil (Rockmills MP-250), registration expired since Apr 2022
Clean Air Tracking System (boiler registrations)
2020 Jan
Sign permit
DOB NOW: Build – Approved Permits
2019 Dec
Sign permit
2019 Dec
Sign permit
2019 Sep
Heating/ventilation permit, General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1929
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.