Building health · MANHATTAN, NY

144 W 75 St

built 1891 · 4 stories · 10 apartments
Registered with the city: 144 WEST 75 STREET LLC

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Aug
Latest accepted inspection Aug 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Jan
Boiler burning natural gas (H.B. Smith 2500L-6), registration current since Jan 2024
Clean Air Tracking System (boiler registrations)
2016 Mar
Plumbing permit, Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
2014 Mar
No active shed permit
2013 Aug
Heating/ventilation permit, General construction permit, Boiler permit
2013 Jul
Heating/ventilation permit, Plumbing permit, General construction permit
2013 Jan
Latest boiler work permit 2013
DOB Permit Issuance (BIS)
2012 Jul
Plumbing permit
DOB NOW: Build – Approved Permits
2011 Jan
Smoke or CO detectorsApt 3B class B · never closed
Housing Maintenance Code Violations
2011 Jan
Smoke or CO detectorsApt 3B class B · never closed
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1891
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.
For AI and developers: llms.txt · API · MCP server · this card as markdown