Building health · MANHATTAN, NY
built 1900 · 5 stories · 10 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2025 Nov
Other conditions class I · paperwork · closed
2025 Oct
General construction permit
DOB NOW: Build – Approved Permits
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2015 May
General construction permit
DOB NOW: Build – Approved Permits
2011 Apr
General construction permit, Construction fence permit, Plumbing permit
2009 Nov
Plumbing permit, General construction permit
2008 Apr
Heating/ventilation permit
2007 Nov
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2000 Oct
Walls, floors and stairsApt 3 class B · never closed
Housing Maintenance Code Violations
1986 Apr
Boiler burning No. 2 oil (Hb Smith Model#200-S-7 Cast HB SMITH MODEL#200-S-7 CAST), registration expired since Apr 1986
Clean Air Tracking System (boiler registrations)
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.