Building health · MANHATTAN, NY

142 W 75 St

built 1891 · 4 stories · 10 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Feb
Latest accepted inspection Feb 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Nov
Boiler burning natural gas (H.B. Smith G19HE-5), registration current since Nov 2024
Clean Air Tracking System (boiler registrations)
2016 Mar
0 open. 7 violations on record in all, 1979–2016 — the 0 most recent are listed here
Housing Maintenance Code Violations
2015 Aug
Plumbing permit
DOB NOW: Build – Approved Permits
2015 Apr
Alteration permit, Plumbing permit
2014 Jul
General construction permit
2014 May
Latest boiler work permit 2014 (3 on record)
DOB Permit Issuance (BIS)
2014 May
Plumbing permit, Boiler permit, General construction permit
DOB NOW: Build – Approved Permits
2014 Mar
General construction permit, Plumbing permit
2013 Dec
Plumbing permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1891
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.