Building health · MANHATTAN, NY
built 1939 · 13 stories · 121 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Nov
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Jun
Boiler burning natural gas (Supreme D5-200-5), registration current since Jun 2026
Clean Air Tracking System (boiler registrations)
2026 May
Heat or hot water
Housing Maintenance Code Complaints and Problems
2026 Mar
Walls, floors and stairsApt 67 class B
Housing Maintenance Code Violations
2026 Mar
Cranes and Derricks class - 2
DOB Violations
2026 Mar
LeaksApt 77
Housing Maintenance Code Complaints and Problems
2026 Mar
LeaksApt 6777
2026 Feb
Latest accepted inspection Feb 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Feb
Plumbing permit
DOB NOW: Build – Approved Permits
2025 Dec
Structural permit
2025 Dec
Suspended scaffold permit
2025 Dec
General construction permit
2025 Nov
Suspended scaffold permit
2025 Oct
Plumbing permit
2025 Oct
General construction permit
2025 Aug
Walls, floors and stairsApt 77 class B
Housing Maintenance Code Violations
2025 Aug
PlumbingApt 77
Housing Maintenance Code Complaints and Problems
2025 Jun
Floors or stairsApt 77
2025 May
General construction permit
DOB NOW: Build – Approved Permits
2025 Feb
Construction class - 2
DOB Violations
2025 Jan
PL-PER Gas Piping - LL152
2024 Dec
Safe with a repair and maintenance program (cycle 9, filed Dec 2024)
DOB NOW: Safety – Facades Compliance Filings
2024 Oct
Plumbing permit
DOB NOW: Build – Approved Permits
2024 Oct
General construction permit
2024 Sep
Walls, floors and stairsApt 67 class B
Housing Maintenance Code Violations
2024 Sep
LeaksApt 67
Housing Maintenance Code Complaints and Problems
2024 Aug
Floors or stairsApt 77
2024 May
Floors or stairs, leaks
2024 Feb
MoldApt 67
2024 Feb
Mold, leaksApt 67
2023 Nov
BE-EXT-LP Boiler
DOB Violations
2023 Nov
BE-EXT-LP Boiler
2023 Nov
BE-EXT-LP Boiler
2022 Dec
Retaining Wall
2022 May
Latest boiler work permit 2022
DOB Permit Issuance (BIS)
2022 Feb
Hazardous Condition (Facade)
DOB Violations
2022 Feb
Failure To Correct Swarmp Conditions (Facade)
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2013 Mar
Low Pressure Boiler never closed
DOB Violations
2007 Jan
Local Law 62/91 - Boilers never closed
1939
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.