Building health · MANHATTAN, NY
built 1909 · 13 stories · 57 apartments
Also known as 357 W 85 St — one building, several doors.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Dec
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Oct
VT-CAT1-CO Elevators
DOB Violations
2026 Oct
VT-PER-CO Elevators
2026 Sep
Construction class - 1
2026 Jan
Latest accepted inspection Jan 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Sep
Boiler burning No. 2 oil (Federal FST-125), registration current since Sep 2025
Clean Air Tracking System (boiler registrations)
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2025 Mar
2 active elevators; latest periodic inspection Mar 2025
DOB NOW Elevator Safety Compliance
2024 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2024 Jun
General construction permit
DOB NOW: Build – Approved Permits
2024 Apr
Smoke or CO detectorsApt 6A class B
Housing Maintenance Code Violations
2024 Apr
Smoke or CO detectorsApt 6A class B
2024 Apr
Fire safetyApt 6A class C · closed
2024 Apr
Heat or hot waterApt 6A
Housing Maintenance Code Complaints and Problems
2024 Apr
Smoke or CO detectors class A
Housing Maintenance Code Violations
2024 Apr
Walls, floors and stairs class A · paperwork
2024 Apr
Walls, floors and stairs class A
2024 Apr
Smoke or CO detectors class A
2024 Apr
Heat or hot water class C · paperwork
2024 Apr
Walls, floors and stairs class A
2024 Apr
Leaks class A
2024 Apr
Walls, floors and stairs class A
2024 Mar
General construction permit
DOB NOW: Build – Approved Permits
2024 Jan
Plumbing
Housing Maintenance Code Complaints and Problems
2024 Jan
Heat or hot water, paint or plaster, leaksApt 6G
2023 Jun
General construction permit
DOB NOW: Build – Approved Permits
2023 Feb
Safe with a repair and maintenance program (cycle 9, filed Feb 2023)
DOB NOW: Safety – Facades Compliance Filings
2023 Jan
Plumbing permit
DOB NOW: Build – Approved Permits
2023 Jan
General construction permit
2022 Oct
Plumbing permit
2022 Sep
Plumbing permit
2022 Sep
Mechanical systems permit
2022 Sep
Mechanical systems permit
2022 Jul
Supported scaffold permit
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1909
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.