Building health · MANHATTAN, NY
built 1900 · 5 stories · 8 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Latest accepted inspection Sep 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2025 Jun
Pests class A · paperwork · closed
2024 Nov
Other conditions class I · paperwork · closed
2024 Apr
Pests class A · paperwork · closed
2017 May
General construction permit
DOB NOW: Build – Approved Permits
2016 Feb
Plumbing permit, General construction permit
2012 Oct
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2002 Sep
General construction permit
DOB NOW: Build – Approved Permits
1997 Nov
Latest boiler work permit 1997
DOB Permit Issuance (BIS)
1997 Nov
Boiler permit, Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
1900 Jan
Boiler burning No. 2 oil (Pacific #278A PACIFIC #278A), registration expired since Jan 1900
Clean Air Tracking System (boiler registrations)
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.