Building health · MANHATTAN, NY
built 1878 · 5 stories · 10 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Latest accepted inspection Sep 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Nov
Other conditions class I · paperwork · closed
2024 Jan
Boiler burning natural gas (H.B. Smith G300-S-9), registration current since Jan 2024
Clean Air Tracking System (boiler registrations)
2023 Nov
BE-EXT-LP Boiler
DOB Violations
2023 Nov
BE-EXT-LP Boiler
2023 Nov
BE-EXT-LP Boiler
2017 Feb
Low Pressure Boiler
2014 May
Low Pressure Boiler never closed
2014 Mar
Smoke or CO detectorsApt 5A class B · never closed
Housing Maintenance Code Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2006 Oct
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2006 Feb
General construction permit
2001 Dec
No active shed permit
2001 Mar
Plumbing permit, Heating/ventilation permit, General construction permit
1999 Aug
Plumbing permit, Alteration permit
1999 Jan
General construction permit
1998 Oct
General construction permit
1878
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.