Building health · MANHATTAN, NY
built 1900 · 5 stories · 8 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
No active shed permit; permits since Oct 2025, last expired Oct 2026
DOB NOW: Build – Approved Permits
2025 Oct
Supported scaffold permit
2025 Oct
Structural permit, General construction permit
2025 Aug
Latest accepted inspection Aug 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Aug
Construction
DOB Violations
2024 Nov
Boiler burning No. 2 oil (H.B. Smith 19A-7), registration current since Nov 2024
Clean Air Tracking System (boiler registrations)
2013 Jul
Heating/ventilation permit, General construction permit, Construction fence permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2006 Dec
Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
2006 Nov
Latest boiler work permit 2006
DOB Permit Issuance (BIS)
2006 Nov
Fuel burning permit, Boiler permit
DOB NOW: Build – Approved Permits
1989 Jul
Doors and windows class A · never closed
Housing Maintenance Code Violations
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.