Building health · MANHATTAN, NY
built 1889 · 6 stories · 10 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Feb
Latest accepted inspection Feb 2026, defects reported: no
DOB NOW: Safety Boiler
2023 Dec
Boiler burning natural gas (H.B. Smith 19HE-5), registration current since Dec 2023
Clean Air Tracking System (boiler registrations)
2023 Feb
Latest boiler work permit 2023 (4 on record)
DOB Permit Issuance (BIS)
2023 Feb
Boiler equipment permit
DOB NOW: Build – Approved Permits
2021 May
No active shed permit; permits since Sep 2020, last expired May 2021
2020 Dec
General construction permit
2020 Oct
General construction permit
2019 Dec
0 open. 2 violations on record in all, 2019 — the 0 most recent are listed here
Housing Maintenance Code Violations
2011 Nov
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2011 Oct
Scaffold permit
2009 Mar
Alteration permit, Plumbing permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1995 Dec
Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
1889
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.