Building health · MANHATTAN, NY
built 1890 · 4 stories · 10 apartments
Registered with the city: ENRANN PROPERTY MANAGEMENT INC. · 1 other building here list it; 109 WEST 75TH STREET INC.; 109 WEST 75TH STRET,INC.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Latest accepted inspection Sep 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Aug
Boiler burning natural gas (Weil Mclain EGH-125), registration current since Aug 2026
Clean Air Tracking System (boiler registrations)
2020 Oct
Plumbing permit, Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
2018 May
Plumbing permit, Heating/ventilation permit, General construction permit
2017 Aug
0 open. 10 violations on record in all, 2016–2017 — the 0 most recent are listed here
Housing Maintenance Code Violations
2014 May
General construction permit, Plumbing permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2003 Jul
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
1890
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.