Building health · MANHATTAN, NY
built 1840 · 4 stories · 3 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Latest accepted inspection Sep 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Aug
1 active elevator; latest periodic inspection Aug 2026
DOB NOW Elevator Safety Compliance
2023 Dec
Structural permit
DOB NOW: Build – Approved Permits
2023 Aug
Plumbing permit
2023 Aug
Mechanical systems permit
2023 Jul
Mechanical systems permit
2023 Jun
Low Pressure Boiler
DOB Violations
2023 May
General construction permit
DOB NOW: Build – Approved Permits
2021 Apr
0 open. 3 violations on record in all, 2015–2021 — the 0 most recent are listed here
Housing Maintenance Code Violations
2019 May
Residential Elevator Periodic Inspection/Test
DOB Violations
2008 Jun
General construction permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2004 Nov
Latest boiler work permit 2004
DOB Permit Issuance (BIS)
2004 Nov
Boiler permit
DOB NOW: Build – Approved Permits
2004 Nov
General construction permit, Heating/ventilation permit
2003 Aug
Alteration permit
2000 Dec
No active shed permit
1988 Apr
Boiler burning No. 2 oil (Weil Mclain #Bl 676 8W WEIL MCLAIN #BL 676 8W), registration expired since Apr 1988
Clean Air Tracking System (boiler registrations)
1840
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.