Building health · QUEENS, NY
built 1950 · 6 stories · 155 apartments
Registered with the city: DELTA MANAGEMENT LLC · 2 other buildings here list it; Fontaine; APT OWNERS CORP
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
3 active elevators; latest periodic inspection Sep 2026
DOB NOW Elevator Safety Compliance
2026 Aug
Latest accepted inspection Aug 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Apr
Boiler burning natural gas (Federal FST-250), registration current since Apr 2026
Clean Air Tracking System (boiler registrations)
2026 Feb
Heat or hot waterApt 601
Housing Maintenance Code Complaints and Problems
2025 Dec
Plumbing
2025 Dec
Heat or hot water
2025 Sep
Doors and windowsApt 623 class C · closed
Housing Maintenance Code Violations
2025 Sep
Doors and windows class B · closed
2025 Sep
Fire safety class C · closed
2025 Sep
Doors and windows class B · closed
2025 Sep
Fire safety class C · closed
2025 Jun
Pests class A · paperwork · closed
2024 Dec
Walls, floors and stairsApt 623 class A · closed
2024 Dec
Heat or hot water class C · closed
2024 Dec
Doors and windowsApt 623 class C · closed
2024 Dec
Heat or hot waterApt 623 class C · closed
2024 Dec
Other conditions class I · paperwork · closed
2024 Dec
Heat or hot water
Housing Maintenance Code Complaints and Problems
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Apr
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2024 Feb
Heat or hot water
Housing Maintenance Code Complaints and Problems
2023 Nov
Heat or hot waterApt 306
2023 Nov
Fire safety class C · closed
Housing Maintenance Code Violations
2023 Nov
Heat or hot waterApt 321
Housing Maintenance Code Complaints and Problems
2023 Nov
Heat or hot water
2023 Nov
Heat or hot waterApt 403
2023 Oct
VT-CAT1-CO Elevators
DOB Violations
2023 Oct
VT-CAT1-CO Elevators
2023 Oct
VT-CAT1-CO Elevators
2023 May
Latest boiler work permit 2023 (3 on record)
DOB Permit Issuance (BIS)
2023 May
Boiler equipment permit
DOB NOW: Build – Approved Permits
2023 Jan
Safe with a repair and maintenance program (cycle 9, filed Jan 2023)
DOB NOW: Safety – Facades Compliance Filings
2022 Dec
Lead-based paintApt 220 class C · paperwork
Housing Maintenance Code Violations
2022 Dec
Lead-based paintApt 220 class C
2021 Dec
Plumbing permit, Heating/ventilation permit
DOB NOW: Build – Approved Permits
2021 Nov
Plumbing permit
2021 Nov
Mechanical systems permit
2018 Apr
General construction permit
2018 Apr
General construction permit
2016 Jun
Plumbing permit, General construction permit
2014 Sep
No active shed permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1950
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.