Building health · MANHATTAN, NY
built 2001 · 8 stories · 83 apartments
Also known as 155 E Broadway, 155 E Broadway, 155 E Broadway, 155 E Broadway, 155 E Broadway, 157 E Broadway, 159 E Broadway — one building, several doors.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Nov
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Sep
Plumbing
Housing Maintenance Code Complaints and Problems
2026 Sep
Plumbing
2026 Jul
General construction permit
DOB NOW: Build – Approved Permits
2026 May
Latest accepted inspection May 2026, defects reported: no
DOB NOW: Safety Boiler
2026 May
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2026 Mar
Supported scaffold permit
DOB NOW: Build – Approved Permits
2026 Feb
General construction permit
2025 Dec
PlumbingApt 5F
Housing Maintenance Code Complaints and Problems
2025 Dec
Heat or hot waterApt 5F
2025 Dec
Heat or hot waterApt 5F
2025 Dec
Heat or hot water
2025 Nov
Doors and windowsApt 5F class C
Housing Maintenance Code Violations
2025 Nov
Fire safety class C · closed
2025 Nov
Other conditions class I · paperwork · closed
2025 Nov
Appliances, general repairs, safetyApt 5F
Housing Maintenance Code Complaints and Problems
2025 Aug
2 active elevators; latest periodic inspection Aug 2025
DOB NOW Elevator Safety Compliance
2025 Jul
General construction permit
DOB NOW: Build – Approved Permits
2025 Jul
Unsafe (cycle 9, filed Jul 2025)
DOB NOW: Safety – Facades Compliance Filings
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2025 Apr
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2025 Mar
Mechanical systems permit
2025 Mar
Heat or hot water
Housing Maintenance Code Complaints and Problems
2025 Mar
Heat or hot waterApt 7A
2025 Mar
Heat or hot waterApt 2A
2025 Feb
Sprinklers permit
DOB NOW: Build – Approved Permits
2025 Feb
Plumbing permit
2025 Jan
Heat or hot waterApt 7A
Housing Maintenance Code Complaints and Problems
2025 Jan
Construction class - 2
DOB Violations
2024 Dec
ElectricalApt 7A
Housing Maintenance Code Complaints and Problems
2024 Dec
AppliancesApt 4B
2024 Dec
Heat or hot waterApt 7A
2024 Nov
Boiler burning natural gas (Lochinvar CWN-0747-PM), registration current since Nov 2024
Clean Air Tracking System (boiler registrations)
2024 Oct
Latest boiler work permit 2024 (3 on record)
DOB Permit Issuance (BIS)
2024 Oct
Boiler equipment permit
DOB NOW: Build – Approved Permits
2024 Oct
Plumbing permit
2024 Sep
Plumbing, leaksApt 8F
Housing Maintenance Code Complaints and Problems
2024 Jun
Failure To Submit Eer
DOB Violations
2024 Jun
Heat or hot water
Housing Maintenance Code Complaints and Problems
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Mar
General repairs, paint or plasterApt 4K
Housing Maintenance Code Complaints and Problems
2024 Feb
Hazardous Condition (Facade)
DOB Violations
2023 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2001
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.