Building health · MANHATTAN, NY

10 Mitchell Pl

built 1931 · 14 stories · 106 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Latest accepted inspection Sep 2026, defects reported: no
DOB NOW: Safety Boiler
2026 May
Plumbing permit
DOB NOW: Build – Approved Permits
2026 Apr
General construction permit
2026 Mar
General construction permit
2025 Mar
3 active elevators; latest periodic inspection Mar 2025
DOB NOW Elevator Safety Compliance
2025 Jan
General construction permit
DOB NOW: Build – Approved Permits
2024 Jun
Boiler burning natural gas (Rockmills MP-125), registration current since Jun 2024
Clean Air Tracking System (boiler registrations)
2023 Jun
Safe (cycle 9, filed Jun 2023)
DOB NOW: Safety – Facades Compliance Filings
2023 Jun
General construction permit
DOB NOW: Build – Approved Permits
2023 Jun
Plumbing permit
2023 Mar
Plumbing permit
2023 Jan
General construction permit
2021 Aug
General construction permit
2021 Aug
Plumbing permit
2021 Mar
No active shed permit; permits since Mar 2020, last expired Mar 2021
2014 May
Low Pressure Boiler never closed
DOB Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1984 Aug
Walls, floors and stairsApt 1G class B · never closed
Housing Maintenance Code Violations
1984 Aug
Walls, floors and stairsApt 1G class A · never closed
1982 Oct
Walls, floors and stairsApt 1G class A · never closed
1931
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.