# 11 New Lots Ave, Brooklyn

What New York City's public records say about this building. Page: https://blueflo.tech/b/11-new-lots-avenue-brooklyn

> These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.

Also known as 23 New Lots Ave, 230 Lott Ave, 240 Lott Ave: one building, several doors, and this card covers all of them.

## In one line

23 open immediately hazardous (class C) HPD violations about pests and fire safety and doors and windows and heat or hot water (Housing Maintenance Code Violations, as of 2026-10-20)

## The building

- **Year built:** 1969 (PLUTO (tax lot data), as of 2026-08-24)
- **Stories:** 6 (Buildings Subject to HPD Jurisdiction, as of 2026-08-12)
- **Homes:** 285 (Buildings Subject to HPD Jurisdiction, as of 2026-08-12)

## Worth knowing

- 23 open immediately hazardous (class C) HPD violations about pests and fire safety and doors and windows and heat or hot water
- 1 hazardous (class 1) building code violation from 2026 is still open
- 18 heat or hot water complaints filed with the city last winter
- Basement on record, and the city's stormwater map shows flooding here in at least one storm scenario
- 101 open HPD violations about building conditions

## Also on record

- On the state's list of buildings with rent-stabilized apartments (2024 registrations)
- City stormwater map shows deep and contiguous flooding at this building in the Extreme storm, 2080 sea levels scenario

## Clean in the records

- Water service line on record as non-lead (field inspection) (Lead Service Line Location Coordinates, as of 2026-01-30)
- Boiler inspection filed Mar 2026 with no defects reported (DOB NOW: Safety Boiler, as of 2026-10-20)
- Outside FEMA's 1% annual-chance flood zone (FEMA National Flood Hazard Layer, as of 2026-10-21)
- Elevator periodic inspection filed within the last year (DOB NOW Elevator Safety Compliance, as of 2026-10-20)

## Building systems

- **Boiler inspection filings:** Latest accepted inspection Mar 2026, defects reported: no (DOB NOW: Safety Boiler, as of 2026-10-20)
- **Facade rating:** Not required: facade inspections apply only to buildings taller than 6 stories (DOB NOW: Safety – Facades Compliance Filings, as of 2026-10-20)
- **Water service line:** Non-Lead (field inspection) (Lead Service Line Location Coordinates, as of 2026-01-30)
- **FEMA flood zone:** Outside FEMA's 1% annual-chance flood zone: X (FEMA National Flood Hazard Layer, as of 2026-10-21)
- **Stormwater flooding:** Extreme storm, 2080 sea levels: Deep and contiguous flooding (1 ft+); Moderate storm, 2050 sea levels: Not in mapped flooding; Moderate storm, today's sea levels: Not in mapped flooding; Limited storm, today's sea levels: Not loaded (file format unreadable) (NYC Stormwater Flood Maps, as of 2024-07-03)
- **Basement:** No basement (PLUTO (tax lot data), as of 2026-08-24)

## Violations and complaints

- **HPD violations:** 101 open: 101 about building conditions — walls, floors and stairs (22), pests (15), leaks (14), doors and windows (10); 23 immediately hazardous (class C). 25 further violations from 2026 were closed. 2,059 violations on record in all, 2004–2026 — the 301 most recent are listed here (Housing Maintenance Code Violations, as of 2026-10-20)
- **DOB violations:** 7 open: 1 about building conditions, 6 about filings or paperwork (DOB Violations, as of 2026-10-20)
- **Heat and hot water complaints:** 18 heat or hot water complaints (Housing Maintenance Code Complaints and Problems, as of 2026-10-20)
- **Resident complaints to the city:** 56 plumbing, 48 paint or plaster, 43 pests, 40 leaks, 37 doors or windows, 36 mold, 34 heat or hot water, 21 general repairs, 16 appliances, 13 floors or stairs, 12 unsanitary conditions, 10 electrical, 7 safety, 3 elevators (Housing Maintenance Code Complaints and Problems, as of 2026-10-20)

## More systems

- **Rent stabilization:** On the state's list of buildings with at least one rent-stabilized apartment (2024 registrations) (Rent Stabilized Building Lists (2024 HCR registrations), as of 2025-11-30)
- **Heat source:** Boiler burning natural gas (Federal FST-125), registration current since Mar 2025 (Clean Air Tracking System (boiler registrations), as of 2026-10-21)
- **Boiler work permits:** Latest boiler work permit 2008 (4 on record) (DOB Permit Issuance (BIS), as of 2026-10-20)
- **Elevators:** 4 active elevators; latest periodic inspection Jul 2026 (DOB NOW Elevator Safety Compliance, as of 2026-10-20)
- **Gas piping:** No open gas piping filing violations. Inspection results themselves are not published (DOB Safety Violations, as of 2026-10-20)
- **Energy:** ENERGY STAR score 16 (2022 report), reported for all of Plaza Residences (f/k/a Noble Drew) (6 buildings) (Energy and Water Data Disclosure (Local Law 84), as of 2025-11-25)

## Permits and work

- **Permit history:** 37 permits since 1990 (DOB NOW: Build – Approved Permits, as of 2026-10-20)
- **Sidewalk shed and scaffolding:** No active shed permit (DOB NOW: Build – Approved Permits, as of 2026-10-20)
- **Landmark status:** Not in a historic district on record (PLUTO (tax lot data), as of 2026-08-24)

## By apartment

46 of 285 apartments named in a city record:

- Apt 1D: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/1d
- Apt 1E: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/1e
- Apt 1G: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/1g
- Apt 1J: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/1j
- Apt 1L: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/1l
- Apt 2C: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/2c
- Apt 2E: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/2e
- Apt 2F: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/2f
- Apt 2J: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/2j
- Apt 2M: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/2m
- Apt 2N: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/2n
- Apt 3A: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3a
- Apt 3B: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3b
- Apt 3D: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3d
- Apt 3E: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3e
- Apt 3F: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3f
- Apt 3G: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3g
- Apt 3H: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3h
- Apt 3I: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3i
- Apt 3J: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3j
- Apt 3L: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3l
- Apt 3M: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/3m
- Apt 4C: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4c
- Apt 4D: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4d
- Apt 4E: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4e
- Apt 4G: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4g
- Apt 4H: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4h
- Apt 4I: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4i
- Apt 4J: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4j
- Apt 4K: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/4k
- Apt 5A: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/5a
- Apt 5C: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/5c
- Apt 5D: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/5d
- Apt 5F: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/5f
- Apt 5K: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/5k
- Apt 5N: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/5n
- Apt 6D: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6d
- Apt 6F: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6f
- Apt 6G: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6g
- Apt 6H: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6h
- Apt 6I: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6i
- Apt 6J: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6j
- Apt 6K: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6k
- Apt 6L: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6l
- Apt 6M: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/6m
- Apt PH: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/unit/ph

## Registered with the city

- Paths Management Services, LLC (Agent, Registration Contacts)
- PLAZA RESIDENCES, L.P. (CorporateOwner, Registration Contacts)
- PLAZA RESIDENCES, LP (TaxLotOwner, PLUTO (tax lot data))

## More

- Every record behind this card: https://blueflo.tech/b/11-new-lots-avenue-brooklyn/records
- The same card as JSON: https://blueflo.tech/v1/buildings/11-new-lots-avenue-brooklyn
- Ask about any building from an assistant (MCP): https://blueflo.tech/mcp
- Report something wrong: https://blueflo.tech/dispute?slug=11-new-lots-avenue-brooklyn
- How to use this data: https://blueflo.tech/llms.txt
